• FEDERALLY FUNDED PROJECTS •
Ft. Irwin UAS Hanger
General Contractor:
Cox ConstructionProject Status:
CompletedProject Scope IncludeD:
Approx 10,000' of site utilities, including domestic water, fire water, sewer, storm drain and natural gas piping.Edwards AFB NASA Flight Research Center
General Contractor:
Southwestern Dakotah Inc.Project Status:
CompletedProject Scope Included:
Installation of 16" fire riser with PIV and 12" fire riser with PIV with concrete/asphalt removal and replacement.
MCAGCC P126
General Contractor:
RA BurchProject Status:
CompletedProject Scope Included:
The installation of storm drain piping up to 36" with multiple structures, and the installation of underground HTHW piping with tie ins to exiting buildings.
Explosives Receiving Building
General Contractor:
Cyber Professional SolutionsProject Status:
CompletedProject Scope IncludeD:
Installation of 8" domestic water main, 10" storm drain, multiple 8" fire risers with backflow, fire hydrants and post indicator valve.Medical-Dental Clinic Remodel
General Contractor:
RA BurchProject Status:
CompletedProject Scope IncludeD:
Installation of 8" fire main with backflow, post indication valve, fire department connection and fire riser.MCAGCC MOFA
General Contractor:
TB Pennick & SonsProject Status:
CompletedProject Scope IncludeD:
Installation of new communications vaults intercepting existing conduits as well as the installation of new 4" conduit runs up 5th and 6th street.Tustin Army Reserve Center
General Contractor:
Cox ConstructionProject Status:
CompletedProject Scope Includes:
Approx 12,000' of site utilities including sewer, water, storm drain, fire suppression and bio-retention basins.• STATE FUNDED PROJECTS •
COD Mecca Campus Expansion
General Contractor:
Seto ConstructionProject Status:
CompletedProject Scope Included:
Over excavation for new building, site rough/final grading as well as storm water retention area with rock lined swale.Indio High School Phase 3
General Contractor:
Ledesma and MeyersProject Status:
CompletedProject Scope Included:
Approx 10,000' of site utilities and multiple underground storm water retention areas.Menifee Elementary School
General Contractor:
Neff ConstructionProject Status:
Under ConstructionProject Scope Included:
Approx 20,000' of site utilities for a new elementary school in Menifee,Ca. On site Storm drain included the the installation of up to 30" RCP with pre manufactured radiuses as well underground Bio Retention area.Indio High School Pool Building
General Contractor:
Empyren PlumbingProject Status:
CompletedProject Scope Included:
Installation of an underground MC-3500 storm chamber system, up to 18" storm drain piping, 8" sanitary sewer system and 8" fire main.Martinez Road Water Main Extension
General Contractor:
Coachella Valley Water DistrictProject Status:
CompletedProject Scope Included:
Installation of 1200LF of 12" DIP water main, fire hydrants, air-vacs, water meter, PRV and tie-ins to existing water mains.Community Day School
General Contractor:
Balfour BeattyProject Status:
CompletedProject Scope Included:
Installation of 6" backflow, PIV, PVC fire main and building riser.Garner Valley Fire Station #56
General Contractor:
Valley Pipeline Inc.Project Status:
CompletedProject Scope Included:
Installation of new septic system with lift station and 300LF of leach line.• PRIVATELY FUNDED PROJECTS •
Mountain View Estates
General Contractor:
Desert Empire HomesProject Status:
CompletedProject Scope Included:
Installation of IID, Verizon and Time Warner conduit for 90 lots.
Cameron Tract
General Contractor:
Davidson CommunitiesProject Status:
CompletedProject Scope Included:
Installation of wet and dry utilities for a 100 lot Town Home Tract in Downtown Palm Springs. Project difficulties included major street crossing across Highway 111.
Chuckwalla Valley Raceway Lodging/Area 33
General Contractor:
Valley PipelineProject Status:
CompletedProject Scope Included:
Installation of wet and dry utilities for a 40 unit lodging site as well as septic system for future sky diving training facility to train US Navy SEALS.
FedEx
General Contractor:
Pence ContructionProject Status:
CompletedProject Scope Included:
Installation of aprox 4,000' of off site 12" DIP water main, fire hydrants, water services, blow offs and existing ties ins. Project difficulties included major traffic control and a 30" direction bore through Cal Trans Right of Way. Valley Pipeline self performed all concrete and asphalt replacement with full lane width grind/overlay as well as traffic striping.